Dealership standby generator installation
Installed commercial standby generator with clean conduit runs and inspection-ready closeout.
Optimum Energy Services installs commercial standby generators and transfer switching across Southern California, load planning, ATS integration, commissioning, and clean closeout built for real outages.

Standby power built for commercial uptime, planned, integrated, and commissioned cleanly.
Generator installs require more than setting equipment. We plan loads, integrate transfer switching, and coordinate site requirements so your system performs when utility power fails.
From installation to commissioning, we deliver clean workmanship, inspection readiness, and documented closeout so the site remains reliable and serviceable long-term.
A complete scope, from load planning to commissioning, delivered with clean coordination and inspection-ready closeout.
Commercial standby generator installs with correct clearances, clean workmanship, and code-first execution.
ATS selection and integration so power transfers safely and reliably during utility outages.
Critical load mapping and capacity planning so standby power supports real operational needs.
Proper pads, anchoring, and equipment setting for stable, long-term reliability and serviceability.
Coordination for natural gas or diesel requirements, routing, ventilation, and site constraints.
Commissioning and functional testing so the system is outage-ready, not just installed.
Integration for lighting, refrigeration, security, IT closets, and essential operations where appropriate.
Inspection-ready documentation, labeling, and clean closeout delivered professionally.
We install standby power for commercial environments where reliability and safety are non-negotiable.
We combine commercial coordination, clean workmanship, and commissioning that proves readiness.
We plan around site constraints, load needs, access, and sequencing so installs stay predictable.
We integrate transfer switching correctly so power transitions are safe, compliant, and reliable.
Startup, transfer verification, and load testing so the system performs during real outages.
Clean documentation and labeling so inspections go smoothly and the site stays serviceable.
Clear checkpoints from load planning to commissioning, built for commercial reliability.
Step 1
We confirm critical loads, placement constraints, access, and a practical plan for standby power.
Step 2
We coordinate permits, ATS strategy, site requirements, and any utility/fuel constraints early.
Step 3
Generator set, conduit, feeders, and transfer switching installed cleanly with commercial workmanship.
Step 4
We verify transfers, test critical loads, and commission the system for real outage performance.
Step 5
We deliver inspection-ready closeout with clean labeling and documentation for long-term serviceability.
A sampling of standby power work completed across Southern California.

Installed commercial standby generator with clean conduit runs and inspection-ready closeout.

Integrated ATS and critical loads with commissioning and transfer verification for reliability.

Commissioned standby power system with functional testing and documentation for long-term serviceability.
Straightforward answers about standby power, ATS integration, commissioning, and closeout.
Yes. We install commercial standby generators, integrate ATS equipment, and commission the system for reliable transfers.
Yes. We review critical loads and capacity needs to recommend a standby strategy aligned to operations.
Yes. We perform startup, functional testing, transfer verification, and commissioning so the system is outage-ready.
Yes. Many commercial projects run after-hours or in phases to protect site access and keep operations moving.
Yes. We deliver clean labeling, documentation, and closeout aligned to commercial inspection expectations.
We’ll plan critical loads, integrate transfer switching, and commission the system so it performs when utility power fails.